Boost in OFF position
With this setting, the CPS2 shore-power unit produces a single-stage UI type load curve. It generates a constant
voltage, supplying the current required by the battery(ies). Recharging time depends on the state of the battery,
being longer than when the boost is in the ON position.
3.2.6 Indicators
INDICATOR
Green "ON"
On
Off
Yellow
On
"Boost/Absorpt
ion"
Flashing
Off
Yellow
On
"Floating"
Off
These indicators are visible from the front of the appliance through the light guides, thereby allowing operation
of the appliance to be monitored.
4
INSTALLATION
This paragraph deals with installation-related arrangements.
Installation and initial commissioning should be carried out by an electrician or professional installer in
accordance with the standards currently in force (for pleasure boats the applicable international
standard is ISO13297).
The installer should familiarize himself with this operating manual and inform users of the instructions
for use and the safety warnings set out in paragraph 7.
UECPS2-12-16/25/40-DEA.DOC
U out
charger
U floating
0
I out
charger
I nom
0
STATE
- Charger is ON
- No or poor quality AC current
or
- Input fuse blown
or
- Internal charger malfunction
- Cut-off of the main circuit breaker
or
- SW1 Switch : Boost in OFF position
or
- SW1 switch : Boost in ON position and Boost/Absorption phase completed
- SW1 Switch : Boost in ON position and charger in the Boost/Absorption phase
- Internal charger malfunction
or
- Output fuse blown
Charger current < 15% of rated current (Floating phase)
Charger current
t
t
MEANING
> 15% rated current
26