Installating A Second Station - Flo Home X5 Guide D'installation

Masquer les pouces Voir aussi pour Home X5:
Table des Matières

Publicité

Installation of a
Second Station
Two FLO Home™ X5 can be connected to a separate or on
the same 40A circuit breaker via a junction . The first
charging station will automatically detect the second.
- Power splitting only works with the FLO Home™ X5.
- When 2 stations are connected to the same circuit breaker,
their output current will be limited to 16A each.
- The two FLO Home™ X5 will synchronize automatically after
the power is restored.
Single circuit breaker setup
N
After a power failure, when two stations are
ote
powered from separate circuit breakers, they are
automatically configured in power sharing mode
for safety purposes.
To restore full power, follow these steps:
1. Disconnect the power from the 2 stations using
the 2 circuit breakers
2. Power the first station and wait for 10 seconds
3. Power the second station
16
Dual circuit breaker setup
September 2018 | flo.com | Installation guide | FLO Home X5

Publicité

Table des Matières
loading

Table des Matières