Installing And Connecting The Charging Station; Position For The Charging Station As Follows - GreenWorks Optimow 4 Manuel Opérateur

Masquer les pouces Voir aussi pour Optimow 4:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 114
Installation

INSTALLING AND CONNECTING THE CHARGING STATION

>1m
>3m
1m
10m
>1m
35cm

Position for the charging station as follows:

In a level spot out of direct sunlight
(The front end of the charging station must not be 5 cm higher or
lower than the back end.)
Within reach of a wall socket
(The low voltage cable is 10 m long.)
With at least 3 m in front of it and 1 m to each side
(Do not position in confined spaces in the operating area.)
The entire charging station must be inside the operating area as shown
in the figure.
EN
9
GREENWORKSTOOLS.EU
Version 1 - 2020.12.31

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Optimow 5Optimow 7

Table des Matières