Installation; Planning Layout And Preparation; Installing And Connecting The Charging Station; Connecting The Power Supply - GreenWorks Optimow 10 Manuel Opérateur

Masquer les pouces Voir aussi pour Optimow 10:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 114

Installation

EN
Read the entire section before beginning installation. Installation affects mower capability.
Plan the installation carefully.
The following are the main tasks within the installation:

Planning layout and preparation

Installing and connecting the charging station

Connecting the power supply

Initial charging of the battery

Installing the boundary wire

Installing the guide wire

Calibrating and initial start up

PLANNING LAYOUT AND PREPARATION

Ensure that the following conditions exist in the operating area where the mower will be used:
The grass is shorter than 10 cm.
There are no stones, loose pieces of wood, wire, live mains cables, and other foreign objects.
The operating area is even and has no ditches, grooves, and steep slopes greater than 35%.
The following tools are required for installation, but not included:
Hammer/rubber mallet to drive the pegs into the ground
Combination pliers to cut the boundary wire
Polygrip to press the couplers together
Hex key, 6 mm for securing the charging station to ground
8
GREENWORKSTOOLS.EU

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Optimow 15

Table des Matières