Installation; Preparation - Klarstein ZELDA Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
20

INSTALLATION

Preparation

If you have an outlet to the outside, your cooker hood can
be connected as below picture by means of an extraction
duct (enamel, aluminium, flexible pipe or inflammable
material with an interior diameter of 150 mm).
• Before installation, turn the unit off and unplug it from
the outlet.
• The cooker hood should be placed at a distance of
65~75 cm above the cooking plane for best effect.
Installation (Vent outside)
Note: When the range hood and appliance supplied with energy other than
electricity are simultaneously in operation, the negative pressure in the room must be
not exceed 4 Pa (4 x 10
Chimney installation
1
Drill 3 x 8 mm holes to accommodate the
bra- cket. Screw and tighten the bracket
onto the wall with the screws & screw
plugs provided.
-5
Bar).
Hang the hood on the hook of the
bracket.
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10029387100319031003541110035412

Table des Matières