Installation
Unpacking and check
With RiseAtlas, the following is included in the package:
1 RiseAtlas lift unit
1 Trolley
1 Hand control
2 Manuals - User manual, Assembly instructions for fuse
1 Charger station
1 Manual emergency lowering key
1 Safety pin H64
1 Safety pin H120 - 160
1 Label (QuickTrolleySystem)
1 Label (Parking for end point charging)
Check to ensure that no components are left in the packaging.
Inspect the lift unit for signs of damage.
Transport and storage
Before shipping, the fuse is removed to prevent battery discharge during transport or long-term storage.
Install the fuse in the lift unit according to the accompanying instructions.
Installing the lift unit
NOTE! The lift unit and carriage must be installed and inspected by authorized personnel according to instructions issued
by Direct Healthcare Group. Periodic inspection must be performed at least once a year. Use only original spare parts.
Service and maintenance must be performed according to instructions in the user manual.
The lift unit must be charged for at least 3 hours before it is used for the first time. The lift unit is shipped with the fuse
removed. Prior to installation the cover is removed and a 20A fuse is inserted. The fuse is packed in a bag. As standard,
the lift unit is factory pre-set for charging at a charger station or End-point charger. When installing the lift unit for in-rail
charging on the rail system, the system must be fitted with charger rails. Exercise caution when installing the lift unit, so
that the charger wheels do not come in contact with the rail, since this may cause short-circuiting. Incorrect installation
may cause short-circuiting and damage the charger.
Alteration of the charging method must be performed by authorized
personnel according to instructions issued by Direct Healthcare Group.
3