Periodic Inspection - Etac Molift RgoSling Active Manuel D'utilisation

Masquer les pouces Voir aussi pour Molift RgoSling Active:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 74
Molift RgoSling Active / www.etac.com
Wash symbols:
Slings can be washed at temperatures
up to 85º C.
176
Tumble drying, max 45º C.
Do not iron
Do not dry clean
Do not bleach
Periodic Inspection Scope
Periodic inspection is a visual examination of the
sling according to Periodic Inspection Report for
Etac/Molift Slings. See www.etac.com.
If the inspection reveals any safety
risks, the sling must immediately
be taken out of service and be
disposed of.
Periodic inspection must be carried out once
every 6 months. More regular inspection may be
required if the sling is used or washed more often
than is normal. The inspection must be performed
by trained personnel.
When performing a periodic inspection, the
inspector shall fill out the inspection report for
Etac/Molift Slings. The reports should be retained
by the person(s) responsible for inspecting the
sling. If the inspection reveals defects and dam-
ages, the owner shall be notified.
When periodic inspection is completed the inspec-
tor shall mark periodic label showing the date
when periodic inspection is performed.
The periodic inspection label can be found behind
the product label, and this will then indicate when
the next service should be performed (within 6
months from last inspection).
Maintenance
Cleaning and disinfection
Washing and drying at high temperatures may
damage the materials in the sling. The sling must
be inspected regularly, preferably prior to each
lifting operation but especially after it has been
washed.
Recycling
Refer to "Recycling instructions" for how to
properly dispose of product. See www.etac.com.

Periodic Inspection

When the sling is used for the first time, the
periodic inspection label should be marked with
month and year. That way it is easier to know
when the first periodic inspection should be
performed.
12
Make sure not to damage or
remove labels when cleaning.

Publicité

Table des Matières
loading

Table des Matières