NewAge Products Pro Serie Mode D'emploi page 17

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

(5/16")
(1/4" dia x 3")
(5/16" dia x 1")
(1/4" dia x 3/4")
(1/4" dia x 3/4")
Concrete Anchor
Lock Nut
Washer
(5/16" x 3")
(5/16")
(1/4")
(1/4")
4ft Cable Assembly
with Turnbuckle
Installing Pad Eye Plate
Option B: Ceiling Configuration
Ceiling Mounted:
18-32"
Ceiling Mounting: Measure and mark 46" from the wall, in line with the wall mounting bracket
9B
(#6) and center of the ceiling joist, this will be the closest eye plate hole (#22) to the wall. Align
the pad eye plate on the center of the ceiling joist and mark the ceiling for pilot holes.
Side View
Ceiling Mounted Depth:
#22
Ceiling Mounted:
18-57"
(Adjustable in 1"
increments)
10B
Drill pilot holes into the solid wood
using a 3/16" drill bit.
Side View
Wood
Stud
Ceiling Mounted Depth:
20"
Wall Mounted:
26"
46"
#6
Warning:
Must bore into
3 inches of solid
wood for lag screw
(#24) to be fully
secured.
Note:
If Ceiling Joists are not in the
required location, refer to
"Installing with Irregular Joist
Spacing" on Page 23.
Secure Pad Eye Plate (#22) to the
11B
stud or joist using two 3" lag screws
(#24), and a 7/16" socket.
17

Publicité

Chapitres

Table des Matières
loading

Table des Matières