Pentair Jung Pumpen WCFIX 260 Instructions De Service page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
ENGLISH
NOTICE! Do not connect more additional objects than a wash-
basin, a bidet and a shower.
Please note that the invert of these additional connections
must be located at least 180 mm above the installation level to
prevent the water sealant in the odour trap from mixing with
the wastewater from the system. In addition, the stagnation
loop needs to be installed as closely as possible to the WCfix.
This will reduce sewage backpressure and air exchange in the
water pipe leading to the shower.
For additional connections there are 2 separate inlets, above
the bottom, at the rear side of the tank for tubes with an out-
side diameter of 40 mm.
In order to decrease bad smells there is an activated carbon
filter which can be installed if required.
Before installation the foil must be removed.
An alternative solution is the connection of a ventilation (d=40
mm) to the roof, that prevents effectively an annoyance caused
by bad smell.
NOTICE! The place of installation must be safe from flooding
and should be well ventilated.
Accessories to fix the unit on the floor against torsion and
floating are enclosed.
MOUNTING
Before installation make sure that all tubes have the required
outer diameter, especially the pressure tube.
Push the pressure elbow onto the outlet of the unit, choose the
direction and fix it with the strap.See to it that the pressure
elbow is completely pushed onto the outlet, to secure a save
installation of the strap.
10
To connect a wash-basin, a shower and / or a bidet, remove the
plug from the inlet. Pay Notice to the installation notes con-
cerning heights, falls and arrangement.
After removing the plug, open the inlet sleeve at the marked
point with a knife or a screwdriver.
NOTICE! The cut out seal must not be left in the container.
The WCfix 260 can be secured against torsion and floating by
using eyelet bolts, dowels and sheet metal screws which are
enclosed.
At first mark the dowel holes on the floor with the enclosed drill
template. Therefore straighten the template at the wall behind
the toilet, check the outlet of the toilet and then draw on the
bore holes on the floor. After that straighten the WCfix 260 on
the template, fold up the side walls and draw on the bore holes
(d=3) on the lower edge of the casing. After drilling the holes
into the floor and the container, mount the eyelet bolts.
Put the pre-assembled WCfix 260 behind the toilet. Push the
unit with the rubber collar DN 100 up to the stop (in the inlet of
the tank) onto the outlet of the toilet. If necessary, moisten the
rubber collar with soap water and level out the heights with the
rubber bases of the unit with washers (not enclosed). Screw
the sheet metal screws into the middle of the eyelet plugs.
NOTICE! The fit of the rubber collar must beperfect.

Publicité

Table des Matières
loading

Table des Matières