Checklist And Release Form - hymer 8473 Instructions De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19

15. Checklist and release form

Check the product every working day. Only use the product if all the
items in the checklist below can be answered by yes.
Is the correct product used?
Are the assembly and use instructions available at the place of
use?
load-bearing capacity?
Is the product standing vertically (check with a spirit level)?
Do the direct surroundings allow safe use of the product where
the product stands or is erected?
Is it ensured that the surrounding factors (e.g. power lines)
product?
components used?
Was the product erected according to these assembly and
ballasting table?
Tower operator;
Company name / address
Place of use:
Authorised person
for assembly:
Telephone:
Date:
Remarks, notes:
Authorised person
for checking:
Telephone:
Mobile tower checked and released:
___________________________________________
Date / Signature
18
EN 1004-2 – en
Is the product easy to access from the inside?
brakes applied?
Are the frame parts correctly assembled and secured?
Are the braces and diagonals installed and secured at the correct
points?
Are the stabilisers correctly installed and are they suitable for the
permitted platform height?
Are the platforms installed at the correct heights and do they
contact the frame properly?
Are all anti-lifting devices (e.g. on the platforms) secured?
form)?
For mobile towers according to DIN EN 1004
Tower make / model:
Height when assembled: __________________ (m)
According to assembly and use instructions
Indoors
Load class:
2 (1.5 kN/m²)
Only instructed persons may use the mobile tower.
These assembly and use instructions must be observed at
all times.
Changes to the tower's design may only be carried out by
the tower installer.
Outdoors
3 (2.0 kN/m²)
2021-08 0095853 8473 TNR
2021-06

Publicité

Table des Matières
loading

Table des Matières