Cable Management - peerless-AV SA771PU Installation Et Montage

Masquer les pouces Voir aussi pour SA771PU:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Cable Management

NOTE: Make sure cables have enough slack to
J
8
allow full movement of the arm.
Run power cable through top or bottom of arm (A)
K
and signal cable(s) through other side of arm in
order to avoid interference with the signal. Lock
cables into place by snapping cable covers (J &
K) onto mount as shown. Display may have to be
moved for easy access.
Optional: If additional cable management is
required route cable ties (G) through slots of arm (A)
as shown in detail 3.
A
SLOT
G
CABLE
DETAIL 3
WALL PLATE RAILS
F
Snap wall plate covers (F) to top and bottom of wall
9
plate rails as shown.
16 of 70
ISSUED: 10-30-09 SHEET #: 095-9299-11 03-22-12

Publicité

Table des Matières
loading

Table des Matières