Check And Carry Out Commissioning - Berbel permalyt BUR 125 DL Manuel De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation
The recirculated air filter permalyt must be connected to the
hob extractor fan.
☞ Insert the connection plug of the recirculated air filter
permalyt into the control box on the fan housing.
☞ Insert the cold appliance plug into the connection socket
on the appliance.
Checking the connection:
☞ Ensure that the hob extractor fan is switched off.
☞ Plug the mains plug into the socket.
If the device is not connected correctly, four beeps will
sound.
☞ Check the connection from the appliance to the hob
extractor fan.
If the device is connected correctly, two will beeps sound.
☞ Make sure that the device can be disconnected on all
poles from the electricity supply after installation.
The device is ready for operation.
48
3.2.4

Check and carry out commissioning

D ATTENTION!
Risk of disruptions due to moisture in the device!
If the device is moved from a cold environment into a hot
one, condensation may form inside.
☞ Wait about 2-3 hours before bringing the device into
service.
☞ Ensure that the air outlets on the hob extractor fan are
not closed or covered.
☞ Ensure that the protective film is removed.
☞ Check that the hob extractor fan is functioning correctly.
6005563_0 – 14.12.2020

Publicité

Table des Matières
loading

Table des Matières