Change Settings in the
Load working mode
display.
Press on the MENU
key for several seconds
until the numbers flash,
you are in setting mode
for the:
H
The load can switch on and off by the
L
Load D2D. The load will switch on at sunset and switch off at sunrise.
L01-L23
The load output will switch on after sunset and switch off after 1-23
hours.
24H
The BlueSolar Charge Controller will continuously supply power to
your load.
Press on the MENU
key again and you go
to:
(Note: the Phoenix
VE.Direct inverters can
be controlled by
connecting to the left
side connection of the
remote control to the
load output)
Press on the MENU
key again and you go
to:
Charge current display. It shows solar to battery current
and charge status.
Press MENU
Load working mode.
The factory setting is 24H
Press MENU
5
to enter next display.
to enter next display.
Load working mode setting.
See table below.
Load on/off switch
Load Setting: trigger value
(Solar Panel Voltage)
When the work mode is L01-
L23 the charge Controller will
measure the solar panel
voltage to decide whether its
day or night to switch load on
or off. The higher this value is
the earlier it switches on the
load output.
The factory setting is 4/8V/16V
L01-L23 trigger delay value
(Seconds)
When the charge Controller
measures a solar panel voltage
lower this value it will delay for
.