8.4
completed installation checklist
WARNING
!
•
Ensure all items are checked for your respective installation or a serious fire hazard could result.
•
Completed installations must conform to local codes or, in the absence of local codes, the National Gas and
Propane Installation Code CSA B149.1 in Canada, or the National Fuel Gas Code ANSI Z223.1 / NFPA 54 in the
United States.
Installer, please tick all boxes for this installation or it IS NOT considered completed.
1. Air damper assembly installed and checked.
2. Collar connector assembly attached.
3. Mounting brackets installed.
4. Rough opening framed into exterior wall.
5. Wall flashing installed and sealed appropriately for finish
material.
6. DHCP-HK attached.
7. Studs framed.
8. Ø 6" (152mm) hole cut into appliance enclosure.
9. Collar plate assembly secured.
10. 6" steel duct (not supplied) installed.
11. 6" rigid steel venting (not supplied) installed.
12. Wiring completed (see "electrical information" section).
13. On/off switch adjusted to fully "on" position.
remote inline installation
Collar Connector Assembly
Mounting Bracket (x2)
Exterior
6" Collar Plate
Assembly
Access
Panel
EN
DHCP-HK
Wall Flashing
Air Damper
Assembly
Interior
6" Steel Duct
(Not Supplied)
6" Rigid Steel
Venting
(Not Supplied)