Garmin REACTOR 40 KICKER YAMAHA EFI Instructions D'installation page 4

Masquer les pouces Voir aussi pour REACTOR 40 KICKER YAMAHA EFI:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 5
3
Place the assembled throttle control linkage
shaft.
The throttle control linkage arm is keyed to fit only one way
on the throttle control wheel.
4
Secure the throttle control linkage to the throttle control wheel
using the 10 mm nut you removed in the first step.
Setting the Linkage Components for Proper Idle
After you install the throttle actuator components on the motor,
you must adjust them so the motor idles correctly.
1
Loosen the throttle actuator bracket on the engine manifold
until the throttle actuator does not pull open the throttle lever.
There should be obvious slack in the throttle actuator cable.
2
Adjust the tiller throttle to idle, start the motor, and complete
an action:
• If the motor is not idling correctly, loosen the set screw on
the throttle lever, adjust the tiller throttle linkage rod until
the motor idles correctly, and tighten the set screw.
• If the motor idles correctly, proceed to the next step.
3
Using the tiller throttle, increase the speed of the motor, and
complete an action:
• If the motor does not increase its speed and return to idle
correctly, repeat the previous step to adjust the tiller
throttle linkage rod.
• If the motor increases its speed and returns to idle
correctly, proceed to the next step.
4
Adjust the position of the throttle actuator bracket until no
slack remains in the throttle actuator cable and the motor
idles correctly.
5
Tighten the throttle actuator bracket on the engine manifold
to set the cable tension.
6
If necessary, turn off the motor.
4
on the throttle
Installation Instructions

Publicité

Table des Matières
loading

Table des Matières