Faults / Troubleshooting; Decommissioning / Disposal - Dimplex WI 35TU Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

10 Faults / troubleshooting

This heat pump is a quality product and is designed for trouble-
free operation. In the event that a fault should occur, it will be
indicated on the heat pump manager display. In this case, con-
sult the "Faults and troubleshooting" page in the operating in-
structions of the heat pump manager.
If you cannot correct the fault yourself, please contact your
after-sales service technician.
CAUTION!
Before opening the device, ensure that all circuits are
disconnected from the power supply!
After disconnecting the power supply, always wait for at least 5
minutes to allow stored electric charges to dissipate.
CAUTION!
Work on the heat pump must only be performed by
authorised and qualified after-sales service technicians!
EN-10

11 Decommissioning / disposal

Before removing the heat pump, disconnect it from the power
source and close all valves. The heat pump must be dismantled
by trained personnel.
All environmentally-relevant requirements regarding the recov-
ery, recycling and disposal of materials and components should
be observed in accordance with the applicable standards. Par-
ticular attention should be paid to the proper disposal of refrig-
erants and refrigerant oils.
452237.66.49a · FD 0108
WI 35TU - WI 45TU
www.glendimplex.de

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Wi 45tu

Table des Matières