Product Operation - Royal Sovereign ARP-912 Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PRODUCT OPERATION

BEFORE PLUGGING IN THE UNIT TO A POWER SOURCE:
1.
Let the appliance stand upright for a minimum of 2 hours. This will reduce the chance of
malfunction in the cooling system from possible mishandling during delivery.
2.
Check to make sure the rubber drain plug is securely plugged into the drainage port on the
back of the unit at the bottom to prevent water leaks.
3.
Check to make sure the exhaust hose has been installed properly (See Installation page 7).
4.
Check to make sure that the air conditioner has been properly vented out the window (See
Installation page 7).
Conduct a Power Plug Check:
1.
Press the RESET button on the power cord.
2.
Plug the cord into an electrical outlet.
3.
Press the TEST button on the power cord. The RESET button should pop up.
4.
Press the RESET button for use.
5.
Do not use the air conditioner if the test fails. The green light on the power cord will
turn on if the plug is working properly.
Note: IF YOU TURN THE AIR CONDITIONER OFF AND IMMEDIATELY RESTART IT, ALLOW
3 MINUTES FOR THE COMPRESSOR TO RESTART COOLING. IN THE EVENT OF A POWER
FAILURE, WAIT 3 MINUTES BEFORE RESTARTING THE UNIT.
ATTENTION: THE UNIT FOR THE UNITED STATES IS SET TO FAHRENEHIT. THE UNIT FOR
CANADA IS SET TO CELSIUS.
8

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Arp-914

Table des Matières