Kohler K-14402 Guide D'installation page 8

Robinet mono-contrôle de lavabo
Masquer les pouces Voir aussi pour K-14402:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Aerator
4. Installation Checkout
Connect the drain tailpiece into the P-trap.
Ensure all connections are tight.
Remove the aerator and remove any debris.
Turn on the main water supply and check for leaks. Repair as
needed.
Lift and rotate the faucet handle to the full hot position, then the
full cold position. Run water through the spout for about one
minute to remove any debris. Check for leaks and repair as
needed.
Push the lever handle down to close the water supplies, then
reinstall the aerator.
1032026-2-D
8
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-14404

Table des Matières