Télécharger Imprimer la page

Valor Retrofire RF24DVN Directives D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

b) RF24DV or RF24ID. Lever off the small
domed cap covering the manifold pressure
setting screw, on the front face of the valve
cover by using a screwdriver or similar.
Front Face of Control Valve
6. Turn on the gas supply and check for leaks
using a soap solution. The minimum and maximum
gas supply pressures are shown in the chart and
should be verifi ed using the Supply Pressure test
tap while the unit is running at full input.
7. Fit a manometer to the manifold pressure test
tap on the valve. Light the appliance and turn the
control to full input. Check for leaks downstream of
the valve.
Inlet Pipe
Manifold Pressure
Test Tap
Supply Pressure
Test Tap
Loosen screw to check
(tighten afterwards)
Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication.
190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1
Pry off
Plastic Cap
Pressure Test Tappings
Designed and Manufactured by / for
Miles Industries Ltd.
Tel. 604-984-3496 Fax 604-984-0246
www.valorfi replaces.com
Adjust the pressure adjustment screw while
the appliance is running at full input to produce
manifold pressure as per the chart.
RF24BV or
RF24XB
Front Face of Control Valve
Pressure Adjustment Screw
behind Cap
RF24DV or
RF24ID
8. Turn the appliance off. Remove the manometer
and tighten the test tapping screw. Refi t the plastic
cover to the valve.
9. Fit the data conversion label and signed
conversion label close to the rating plate. Fit the
control conversion label near the controls.
10. Reassemble the ceramics, install the window, and
check if the appliance operates correctly (refer to
the RF24 installation manual).
11. Adjust the aeration shutter (if necessary) as
described in the RF24 installation manual.
Increases Pressure
Decreases Pressure
3

Publicité

loading