Emerson LOFT CF765BQ01 Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Ceiling Fan Assembly
3.10
Route the Two 80" Motor Wires through the Hanger
Ball.
Reinstall the Hanger Ball on the Downrod, as follows:
Position the Hanger Ball Pin through the two Holes in
the Downrod and align the Ball so the Pin is captured in
the Groove in the top of the Hanger Ball (Figure 10) .
Pull the Hanger Ball up tight against the Pin and
securely tighten the Set Screw in the Hanger Ball.
NOTE: A loose set screw could create fan wobble.
WARNING
!
It is critical that the pin in the hanger ball is properly
installed and the set screw securely tightened. Failure
to verify that the pin and set screw are properly
installed could result in the fan falling.
3.11
The Fan comes with Black and White Wires that are
80" long.
Measure up approximately 6 to 9-inches above top of
Hanger Ball / 6" Downrod Assembly (Figure 11).
Cut off excess Leads and strip back insulation 1/2-inch
from end of Wires, using Wires Strippers.
(Continued)
SETSCREW
CEILING COVER
DOWNROD
Figure 10
6 TO 9
INCHES
1/2
INCH
Figure 11
Please contact 1-800-654-3545 for further assistance
9
PIN
HANGER
BALL
BLACK WIRE
WHITE WIRE
HANGER BALL
emersonfans.com
U.L. Model No.: CF765-1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Loft cf765bs01Loft cf765grt01Loft cf765ww01

Table des Matières