Receiving And Inspecting The Equipment; Storage; Unpacking - Parker NITROSource N2-20P Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 91

2.5 Receiving and Inspecting the Equipment

The equipment is supplied in a sturdy wooden crate designed to be moved using a forklift truck or pallet truck. Refer to the technical specification
for packed weights and dimensions. On delivery of the equipment check the crate and its contents for damage and verify that the following items
have been included with the generator.
If there are any signs of damage to the crate, or there are any parts missing please inform the delivery company immediately and contact your
local Parker domnick hunter office.

2.5.1 Storage

The equipment should be stored, within the packing crate, in a clean dry environment. If the crate is stored in an area where the environmental
conditions fall outside of those specified in the technical specification, it should be moved to its final location (installation site) and left to stabilise
prior to unpacking. Failure to do this could cause condensing humidity and potential failure of the equipment.

2.5.2 Unpacking

Remove the lid and all four sides of the packing crate. Unscrew the exhaust silencer from the generator and lift the generator on to it's feet using
suitable slings and an overhead crane as illustrated.
Remove the four wooden blocks from behind the shroud.
Once positioned in its final location refit the silencer to the generator.
Ref
Description
1
Dust filter
2
1/2" ball valve (N2 inlet from buffer vessel)
3
1" BSPP ball valve (N2 Outlet to buffer vessel)
4
1/2" 3-way ball valve (N2 Outlet)
5
1" BSPP ball valve (Compressed Air Inlet)
Qty
1
1
1
1
1
9 - EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Nitrosource n2-80p

Table des Matières