The equipment is supplied in a sturdy wooden crate designed to be moved using a forklift truck or pallet truck. Refer to the technical
specification for packed weights and dimensions.
On delivery of the equipment check the crate and its contents for damage and verify that the following items have been included:
If there are an signs of damage to the crate, or there are any parts missing please inform the delivery company immediately and contact your
local Parker domnick hunter office.
2.2.1 Storage
The equipment should be stored, within the packing crate, in a clean dry environment. If the crate is stored in an area where the environmental
conditions fall outside of those specified in the technical specification, it should be moved to its final location (installation site) and left to stabilise
prior to unpacking. Failure to do this could cause condensing humidity and potential failure of the equipment.
2.2.2 Unpacking
Remove the lid and all four sides of the packing crate (A) and unscrew the exhaust silencer from the generator (B). Lift the generator on to its
feet using suitable slings and an overhead crane (C, D and E).
Carefully move the generator to its final location, using a forklift truck or pallet truck, and refit the silencer.