Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
DESCRIPTION:
Note: BEAMBAR5-RGBW shown, BEAMBAR10-RGBW has identical controls & connections.
1. MAINS INPUT: equipped with original Neutrik PowerCON
®
PowerCon
extension cable here.
2. MAINS OUTPUT: used to daisy chain the power to several other projectors. Always pay attention to the
maximum load while adding projectors! Special Multi cables (PowerCON
optionally available: see our website!)
3. MAINS FUSE: protects the unit in case of electrical problems, always use the prescribed fuse!
4. DMX IN/OUT: both 3pin and 5pin in/outputs are available to daisy chain the projector with other units that
will be controlled by a DMX-controller.
5. ETHERNET IN/OUT: used to connect the projector to an Ethernet network, Art-Net protocol is supported.
6. [MODE] button: used to browse the different options of the setup menu.
7. [ENTER] button: used to jump between different parameters of the selected option. Also confirms the
selected values of the parameters.
8. ↑/↓Buttons: used to increase/decrease the value of the selected parameter.
9. LCD DISPLAY: backlit 2x 16character LCD-display for easy navigation. The backlight lights up as soon
as one of the buttons is pressed. Shows the model + software version at startup.
10. MIC: used to trigger the programs in music mode.
11. BRACKET: multifunctional and very stable design for both floor and truss mounting. Prepared to install
omega brackets, optionally available from Briteq. The projector can be directed in any direction.
12. SAFETY EYEBOLT: used to attach a safety cable when the unit is rigged (see paragraph "overhead
rigging"

OVERHEAD RIGGING

 Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
 Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
 Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed at least 50cm from surrounding walls.
 The device should be installed out of reach of people and outside areas where
persons may walk by or be seated.
 Before rigging make sure that the installation area can hold a minimum point load of
10times the device's weight.
 Always use a certified safety cable that can hold 12times the weight of the device
when installing the unit. This secondary safety attachment should be installed in a way
that no part of the installation can drop more than 20cm if the main attachment fails.
BRITEQ
®
®
. Connect the supplied mains cable or any
3/84
OPERATION MANUAL
®
+ DMX XLR-cables are
BEAMBAR5+10-RGBW

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Beambar5-rgbw

Table des Matières