System Wiring - Emerson White-Rodgers 36J22 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

SYSTEM WIRING

REFER TO AND FOLLOW THE APPLIANCE
MANUFACTURER'S WIRING DIAGRAM.
REFER TO FIGURES 3 AND 4 FOR TERMINAL
IDENTIFICATION.
All wiring should be installed according to local
and national electrical codes and ordinances.
Always check that the electrical power supply
used agrees with the voltage and frequency
shown on the gas control.
Inlet Pressure Post
.339 Dia. +DFT.
(Set Screw: 3/32" Hex Head)
Accept 5/16" I.D. Hose
Connec on
4
NOTE
4.693" Inlet to Outlet
On/Off
Switch
Fig. 3 – Single Stage Valve Features, Terminals and Wiring
High Efficiency model furnace with separate
enclosed burner chamber – connect ¼" tubing
supplied by furnace manufacturer to the 90°
Hose Barb Fitting. This fitting may also Tee into
the pressure switch. Refer to Furnace manufac-
turer's instructions for additional details.
Lower Efficiency models and High Efficiency
models without separate burner chamber – the
90° Hose Barb Fitting requires no connection.
Leave the fitting in place to protect the vent
from dust or water intrusion
Outlet Pressure Post
.339 Dia. +DFT.
(Set Screw: 3/32" Hex Head)
Accept 5/16" ID Hose Connection
Control I.D. Label
1/4" x .032" THK. Male
Spade Terminals (2)
NOTE
90° Hose Barb Fitting
Regulator Cover Screw
(Reg. Adj. Beneath This Screw)
3/16" Ground Terminal
On/Off
Switch
Main and
Redundant
Valves

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

White-rodgers 36j24White-rodgers 36j54White-rodgers 36j55

Table des Matières