Installation; Application Guidelines - Siemens SITRANS FUE1010 IP40 NEMA 1 Guide Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

2.1

Application Guidelines

Basic Requirements
● Determine pipe material and dimensions.
● Avoid vertical pipes flowing in a downward direction.
● Avoid installation of transducers on the top and bottom of horizontal pipes, if possible.
● Select a location with the longest straight run of pipe.
● Identify upstream piping configuration (elbow, reducer, etc.).
● Pipe surface should be smooth and, if necessary, free of paint.
● Avoid pressure reduction components upstream.
● Avoid mounting on or near weld seams.
● Pipe must be full to achieve proper operation.
The flowmeter has an optional battery charger that operates from a 100, 110 or 220 VAC (50Hz
or 60Hz) power source. It has a universal power input that requires no user switching.
cords can be provided for connection to AC outlets in most countries.
The 1015BCK-1 Power Adapter/Battery charger is NOT waterproof or water resistant. Do not
allow it to become wet, or attempt to use it when wet. Exposure to a wet or submerged
environment will result in damage to the unit that cannot be repaired and could expose the
user to the risk of electric shock.
FUE1010 IP40 (NEMA 1) Energy Portable
Compact Operating Instructions, 5/2009, A5E02384186-03
CAUTION
2
Optional
7

Publicité

Table des Matières
loading

Table des Matières