The Following Instructions Must Be Followed - Rinnai Q Premier QP85N Instructions D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.4 The following instructions must be followed

!
WARNING
!
DANGER
-
The boiler must only be used for its designated purpose, as described in the
Installation Instructions.
-
Each unit is fi tted with a data plate. Consult the details on this plate to verify whether
the boiler is compliant with its intended location, e.g.: gas type, power source and
venting classifi cation.
-
Only use the boiler with the accessories and spare parts listed.
-
Other combinations, accessories and consumables may only be used if they are
specifi cally designed for the intended application and do not affect the system
performance and the safety requirements.
-
Maintenance and repairs must be performed by a licensed professional.
-
Installation of a condensing gas boiler must be reported to the relevant gas utility
company and have it approved.
-
You are only allowed to operate the condensing gas boiler with the vent system
that has been specifi cally designed and approved for this type of boiler.
-
Please note that local permission for the vent system and the condensate water
connection to the public sewer system may be required.
You must also respect:
-
The local building codes stipulating the installation rules.
-
The local building codes concerning the air intake and outlet systems and the
chimney connection.
-
The regulations for the power supply connection.
-
The technical rules established by the gas utility company concerning the
connection of the gas connection to the local gas mains.
-
The instructions and standards concerning the safety equipment for the water/
space heating system.
-
The Installation Instructions for building heating systems.
-
The boiler must be located in an area where leakage of the boiler or connections
will not result in damage to the area adjacent to the boiler or to lower fl oors of
the structure. When such locations cannot be avoided, it is recommended that a
suitable drain pan be installed under the boiler.
-
The boiler must be installed in such way that the all components are protected
from water (dripping, spraying, rain etc.) during boiler operation and service.
-
The boiler must not be installed on or against carpeting.
-
Do not restrict or seal any air intake or outlet openings.
-
If you fi nd any defects, you must inform the owner of the system of the defect and
the associated hazard in writing.
In failure to properly commission the boiler as described in section 13 may result
unreliable burner operation, reduced component life, and unsafe boiler operation.
DANGER. Gas is fl ammable and may cause an explosion.
Beware if you smell gas: there may be an explosion hazard!
If the information in these instructions is not followed exactly, a fi re or explosion may
result causing property damage, personal injury or death.
-
Do not store or use gasoline or other fl ammable vapors and liquids in the vicinity
of this or any other appliance.
5

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Q premier qp130n

Table des Matières