Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25
ECONCEPT TECH 25 C - 35 C
Table. 5 - Max. length separate ducts
ECONCEPT TECH 25 C
Max. permissible length
Table. 6 - Accessories
PIPE 1 m M/F
BEND 45° M/F
90° M/F
PIPE SECTION with test point
Ø 80
TERMINAL air, wall
fumes, wall with antiwind
FLUE Split air/fumes 80/80
Fume outlet only Ø80
PIPE 1 m M/F
BEND 90° M/F
Ø 60
REDUCTION 80/60
TERMINAL fumes, wall with antiwind
ATTENTION: CONSIDER THE HIGH PRESSURE LOSSES OF Ø60 ACCESSORIES;
USE THEM ONLY IF NECESSARY AND AT THE LAST FUME EXHAUST SECTION.
Connection to collective flues
C
8X
fig. 14 - Examples of connection to flues (
Table. 7 - Typology
Type
Description
C2X
Intake and exhaust in common flue (intake and exhaust in same flue)
C4X
Intake and exhaust in common and separate flues , but undergoing similar wind conditions
C8X
Exhaust in single or common flue and wall intake
B3X
Intake from installation room by means of concentric duct (that encloses the exhaust) and exhaust in
common flue with natural draught
IMPORTANT - THE ROOM MUST BE PROVIDED WITH APPROPRIATE VENTILATION
If the boiler is to be connected ECONCEPT TECH 25 C - 35 C to a collective flue or a
single flue with natural draught, the flue or chimney must be expressly designed by pro-
fessionally qualified technical personnel in conformity with the current regulations and be
suitable for sealed chamber units equipped with fan.

3.7 Condensate drain connection

The boiler is equipped with an internal trap for condensate draining. Fit the inspection
union A and the flexible tube B, pressing it on about 3 cm and securing it with a clamp.
Fill the trap with approx. 0.5 l of water and connect the flexible tube to the drainage sys-
tem.
fig. 15 - Condensate drain connection
ECONCEPT TECH 35 C
75 m
55 m
eq
eq
Losses in m
Air
Fume exhaust
inlet
Vertical
1KWMA83W
1.0
1.6
1KWMA65W
1.2
1KWMA01W
1,5
1KWMA70W
0.3
1KWMA85A
2.0
1KWMA86A
-
010027X0
-
010026X0 +
-
1KWMA86U
1KWMA89W
1KWMA88W
041050X0
1KWMA90A
C
4X
C
2X
= Air /
= Fumes)
cod. 3540R812 - 06/2011 (Rev. 00)
4. SERVICE AND MAINTENANCE
4.1 Adjustments
Gas conversion
The unit can operate on Natural Gas or LPG and is factory-set for use with one of these
two gases, as clearly shown on the packing and on the dataplate. Whenever a different
gas to that for which the unit is arranged has to be used, a conversion kit will be required,
proceeding as follows:
1.
Remove the casing.
eq
2.
Open the sealed chamber.
3.
Release the fixing clip C and remove gas pipe A from the fan - venturi assembly.
Horizontal
4.
Replace nozzle B, inserted in the gas pipe, with that contained in the conversion kit.
5.
Reassemble gas pipe A with the clip and check the seal of the connection.
2.0
6.
Apply the label, contained in the conversion kit, near the dataplate.
1.8
7.
Refit the sealed chamber and casing.
2.0
8.
Modify the parameter for the type of gas:
0.3
-
put the boiler in standby mode
5.0
press the DHW buttons detail 1 - fig. 1 for 10 seconds: the display shows "P01"
flashing.
12.0
press the DHW buttons detail 1 - fig. 1 to set parameter 00 (for use with natural
4.0
gas) or 01 (for use with LPG).
press the DHW buttons detail 1 - fig. 1 for 10 seconds.
6.0
the boiler will return to standby mode
4.5
5.0
9.
Using a combustion analyser connected to the boiler fume outlet, check that the
7.0
CO2 content in the fumes, with the boiler operating at max. and min. output, match-
es that given in the technical data table for the corresponding type of gas.
TEST mode activation
Press the heating buttons (detail 3 - fig. 1) at the same time for 5 seconds to activate the
TEST mode. The boiler lights at the maximum heating power set as described in the fol-
lowing section.
The heating and DHW symbols (fig. 17) flash on the display; the heating power will be
displayed alongside.
fig. 17 - TEST mode (heating power = 100%)
Press the heating buttons (detail 3 - fig. 1) to increase or decrease the power (Min.=0%,
Max.=100%).
Press the DHW button "-" (detail 1 - fig. 1) and boiler power is immediately adjusted to
min. (0%). Press the DHW button "+" (detail 1 - fig. 1) and boiler power is immediately
adjusted to max. (100%).
If the TEST mode is activated and enough hot water is drawn to activate the DHW mode,
the boiler remains in TEST mode but the 3-way valve goes to DHW.
To deactivate the TEST mode, repeat the activation sequence.
The TEST mode is automatically disabled in any case after 15 minutes or on stopping of
hot water drawing (if enough hot water was drawn to activate DHW mode).
fig. 16 - Gas conversion
EN
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Econcept tech 35 c

Table des Matières