Installation; Unpacking And Contents Check; Battery Module Connection - Eaton 5SC 500 Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Installation

3.1 Unpacking and contents check

(1) 5SC UPS
(2) Quick start and safety instructions
(3) User manual and IPSS (Intelligent Power Software Suite) CD-ROM
(4) RS232 communication cable
(5) USB communication cable
(6) 2 connection cables for the protected equipments (500G, 750G and 1500G models)
Packing materials must be disposed of in compliance with all local regulations concerning waste.
Recycling symbols are printed on the packing materials to facilitate sorting.

3.2 Battery module connection

Caution: Before starting the UPS, please connect the internal battery.
Note: A small amount of arcing may occur when connecting the batteries.
This is normal and does not damage the UPS or present any safety concern.
Page 10
1
2
A
6
4
3
A - Remove front panel.
B - Connect the battery module
B
C - Attach the front panel.
C
5
(never pull on the wires).
619-00470-02-us (en)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5sc 7505sc 10005sc 15005sc 500g5sc 750g5sc 1500g

Table des Matières