Trigano NORTH-TWIN Notice De Montage page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FOR INFLATION
• The entire frame is inflated through a single
valve.
• On the pump (1) : Connect the inflation tube
• On the valve (2) : Remove the valve cap (A), fit
the appropriate valve adapter to the end of the
inflation tube (B) and connect it to the valve.
You can now start inflating the arches by perfor-
ming regular pumping movements.
Once the pole is inflated to the correct pressure,
remove the tube (B) end and refit the valve cap (A).
Inflate each pole to:
0.344 BARS / 5 PSI.
DO NOT INFLATE ABOVE
THESE VALUES AS THIS
MAY RESULT IN THE POLES
BURSTING.
TO DEFLATE
• Simply unscrew the caps of the 2 valves to
deflate (C).
Notice NORTH-TWIN.indd 15
1
2
3
- 15 -
ENGLISH
A
B
C
04/10/2019 12:19

Publicité

Table des Matières
loading

Table des Matières