Ecoflam MAX GAS 350 P Notice D'emploi page 17

Masquer les pouces Voir aussi pour MAX GAS 350 P:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Service
- Troubleshooting
Fault diagnosis and repair
In the event of a malfunction, first check
that the prerequisites for correct
operation are fu llfilled:
1. Is the system connected to the
power supply?
2. Is there any gas pressure?
3. Is the gas shut-off valve open?
4. Are all control and safety devices,
such as the boiler thermostat, low
water level detector, limit switch,
etc. adjusted correctly?
If the malfunction persists, use the
following table.
It is not permitted to repair any
components relevant to safety. These
420010492300
components must be replaced by parts
with the same order number.
Only use original spare parts.
NB: after each operation:
• under normal operating conditions
(doors closed, hood fitted, etc.), check
combustion and check the individual
lines for leaks.
• Record the results in the relevant
documents.
E-BCU diagnostic tool must be used to
read the faults by service personell.
www.ecoflam-burners.com
EN
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Max gas 500 p

Table des Matières