Examine The Gas Supply System For Leaks - Norcold N300 Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

- Put the propane gas supply line up through the floor of the enclosure.
- Make sure the hole through the floor is large enough to allow clearance for the gas supply line.
- Put a weather resistant seal (grommet, sealant, etc.) around the gas supply line where it goes through the floor to prevent vibration
and abrasion.
- To prevent vibration and abrasion, make sure that the gas supply line is not against anything in the enclosure.
- Attach the gas supply line to the bulkhead fiting [2] of the refrigerator (See Art01254).

Examine the gas supply system for leaks:

Do not allow the leak detecting solution to touch the electrical components. Many liquids are electrically
!
WARNING
conductive and can cause a shock hazard, electrical shorts, and in some cases, fire.
Use a leak detecting solution to examine the gas supply line and all propane gas connections for leaks.
If you use compressed air for the test:
- The pressure at the manual shut off valve of the refrigerator must not be more than 1/2 psig (14 inches Water Column).
- If the air pressure is more than 1/2 psig (14 inches Water Column), remove the gas supply line from the bulkhead fitting of the
refrigerator before the test.
- If the air pressure is equal to or less than 1/2 psig (14 inches Water Column), close the manual shutoff valve of the refrigerator
before the test.
Installation Manual 11

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

N300x

Table des Matières