Extended Periods Of Inactivity; Maintenance At The Start Of The Season - CLIVET CELING&FLOOR-SM2 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.5

Extended periods of inactivity

If you do not plan to use the air conditioner for an
extended period of time, proceed as follows:
Clean all filters
Turn off the unit and
disconnect it from the
mains power supply
28
Activate the Ventilation mode
until the unit is completely dry
(at least 12 hours)
Remove the batteries
from the remote control
4.6
Maintenance at the start of the
season
After a long period of non-use, or before a period of
frequent use, proceed as follows:
Check that the cables are
intact
Check that there are no
leaks
Remove all obstacles that could block the
openings of the indoor and outdoor units.
Clean the air filter and the front grille of the
indoor unit. Refit the clean and dry air filter in its
original position.
Turn the main power switch on at least 12 hours
before switching the unit on.
Maintenance
Clean all filters
Replace batteries

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Celing&floor-sl2If2-xy 53m serieIf2-xy serie

Table des Matières