Installation Overview - Napoleon Ascent Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

general information
EN
1.3

installation overview

1
9
4
2
5
10
6
3
8
7
Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Install rough framing (refer to "rough framing" section).
3. Place the appliance in its fi nal position.
4. Install nailing tabs (refer to "nailing tab installation" section).
5. Install appliance venting (refer to "venting installation" section).
6. Install all electrical wirings (refer to "electrical information" section).
7. Install gas lines (refer to "gas installation" section).
8. Test appliance.
9. Complete framing (refer to "fi nish framing" section).
10. Finishing (refer to "fi nishing" section).
7
W415-2757 / B / 01.09.20

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ascent bl46Ascent bl36Ascent bl46nteAscent bl36nte-1Ascent bl46pteAscent bl36pte-1 ... Afficher tout

Table des Matières