HOW TO SCREED FORM TO FORM

Length of board should overlap form boards on both
sides of the pour
Keep bottom of blade as flat as possible while striking
off of forms
To ensure the longest possible board life, use the
lowest possible vibration setting in relationship to the
slump of concrete being used.
BOARD KEPT FLAT
Excess Concrete
Keep bottom of blade as flat as possible while
striking off of forms
TRAILING EDGE
Excess Concrete
An elevated trailing edge may provide an area
for concrete to build up resulting in a slab
elevation that is too high
WS570
104 S. 8th Ave. Marshalltown, IA Phone 800-888-0127 / 641-753-0127 • Fax 800-477-6341 / 641-753-6341 www.MARSHALLTOWN.com
04-2018/Rev.B
ELEVATED
ELEVATED
LEADING EDGE
Excess Concrete
An elevated leading edge can trap rocks
between the blade and forms resulting in a
slab elevation that is too high
11 of 48