Lewmar C10 Capstan Manuel D'installation, De Fonctionnement Et D'entretien page 3

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3- Installation
Lewmar recommends C10/12 capstan are specified and installed by
competent marine engineers.
Plan location carefully:
• Ensure the rope feed correctly.
• Check space available under deck for electric/hydraulic motor unit and cable runs
• With the handle inserted, check that the drum can rotate through 360 degrees.
1. Drill and cut the holes to the size detailed on the template. With a sandwich construction, it is impor-
tant to seal the exposed surfaces.
2. Maximum deck thickness 60mm.
3. If the deck is not flat a suitable mounting pad may be required above and below deck to take up
camber or sheer. Care must be taken to ensure that the top and bottom mounting surfaces are paral-
lel for correct alignment.
4. Remove the drum cap, washer and drum by undoing the cap with the handle provided.
Select M16 bolts of suitable length (not supplied by Lewmar).
5. Apply a bead of suitable sealant/bedding compound and mount the
capstan through the deck.
Replace the drum and washer and secure them with the drum cap.
6. Under deck, lightly coat the shaft with grease. Ensure the drive key is in place and, selecting the most
suitable positions (electric motor only), slide the motor/ gearbox into position.
Assemble the nuts and washers and secure tightly.
Max
1
4
Lewmar C10/12 Capstan Manual ref B10407 iss.1
WARNING! Extremely heavy,
use mechanical lift aid.
2
5
DO NOT use a permanent
adhesive/sealant
GB
3
6
|
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

C12 capstan

Table des Matières