Erreka DOLFIN Guide Rapide D'installation Et Programmation page 7

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 11
Unlocking for manual operation:
Turn the key clockwise 270º.
1 Make the M mark with a pencil.
4 Attach the operator to the base.
Unlocking
Unlocking
D157A
Mounting the track and the belt
2 Position the first section of the
profile and the three pins,
respecting their orientation.
>10cm
P154A2
5 Position the belt in the attachment
point (1), the cover (2) and the
tensioner nut (3).
2
3
P154G
Locking
Motorised operation locking:
Turn the key anti-clockwise 270º as far as it
goes (you should hear a CLICK), and move the
gate manually until it interlocks in the drive
mechanism.
3 Position the following profile
>10cm
1/2 1/2
P154E
1
P154L
D157B
sections, ensuring they are securely
fitted.
>10cm
6 Tighten the belt (with the
operator unblocked and the gate
in an intermediate position).
P154F
P154M
7

Publicité

Table des Matières
loading

Table des Matières