Beko KCF 200 Instructions De Montage Et De Service page 14

Table des Matières

Publicité

Installation • Instalación
Installation • Instalação
14
english
Please check the relevant legal regula-
tions in your country. You should also
contact the public authorities in your area,
since there may be regional variations.
1. Area of installation
• Sealed floor or spill basin!
KCF200 = 42 gallons
KCF400 = 62 gallons
It is crucial to ensure that untreated con-
densate or oil cannot get into the sewer
system in the event of damage.
• The floor area must be stable and level
(max. inclination 1°) to ensure reliable
functioning of the KCF.
Oil collector connection
• Place collector on the same floor level
as the KCF to ensure oil discharge.
• Firmly screw the oil outlet pipe to the
collector so that oil cannot leak out (not
even in the event of KCF overload-
ing).
2. Inflow
Up to 4 feed points can be connected
directly to the KCF.
If there are more than 4 feed points, it will
be necessary to lay a collecting line.
• Ring system along the wall:
- nominal diameter 1" (DN 25)
- above KCF inlet (height above floor)
- slight slope down to the KCF unit (min.
1°)
• Feed in the condensate from the top
into collecting line (swan-neck pipe
bend)
KCF 200, 400

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kcf 400

Table des Matières