DRRD-12 ... 63
3. Feed the appropriate lines through the hollow
drive shaft, if necessary, or use the variant
with energy throughfeed.
The shaft opening for wiring has the following
dimensions (è Tab. 2).
4. When mounting the moving mass, make sure
that the following specifications are observed:
– installation without tilting
– permissible radial force Fy
– permissible axial force Fx
– permissible mass moment of inertia
– a structure that is as rotationally symmet
rical as possible.
The mass moment of inertia of the payload should be calculated. Lever arms, cantilevers and
masses should be considered in the calculation (maximum permissible values è Catalogue
specifications, www.festo.com/catalogue).
Note
If there are demanding requirements for concentricity of the components on the flanged
shaft:
Use the middle centring hole 4 as well as one of the 4 existing centring holes.
5. Secure the effective load to the drive flange at
the mounting interface aA by using at least
two screws positioned opposite one another
and centring sleeves.
The tightening torque is summarised in the
following table (è Tab. 2).
Size
Shaft opening 4
Centring sleeve ZBH for middle
centring hole
Screw for thread at aA
Centring sleeve ZBH
Tightening torque
Tab. 2
Festo – DRRD-12 ... 63 – 1607c English
Fig. 3
Fig. 4
12
16
20
[mm]
5
8
8
[mm]
7
12
12
M3 M4
M4
[mm]
5
7
7
[Nm]
1.2 3
3
4
25
32
35
40
10.5 10.5 10.5 21
15
15
25
25
M5
M6
M6
M6
9
9
9
9
6
10
10
10
aA
50
63
21
21
25
25
M8
M10
12
15
20
40
21