Package Contents; Installation - OHAUS ISHD16HDG Manuel D'instructions

Table des Matières

Publicité

Incubating Shaker

1.3. Package Contents

Incubating Orbital Shaker
Non-skid rubber mat
Power cord
Instruction manual

1.4. Installation

Upon receiving the Ohaus Incubating Orbital Shaker, check to ensure that no damage has occurred during
shipment. It is important that any damage that occurred in transport is detected at the time of unpacking. If
you do find such damage the carrier must be notified immediately.
After unpacking, it requires at least two (2) people to lift the Incubating Orbital Shaker, from the bottom, to
place on a level bench or table, away from explosive vapors. It is preferable to use a hydraulic lift or other
appropriate equipment when handling the unit.
Do not lift unit by the front bezel. Ensure that the surface on which the unit is placed will withstand typical
heat produced by the unit. Always place the unit on a sturdy work surface.
The Incubating Orbital Shaker is supplied with a power cord that is inserted into the IEC connector on the
back or side of the unit first, then it can be plugged into a properly grounded outlet. The 120V unit plugs into
a 120 volt, 50/60 Hz source. The 230V unit plugs into a 230 volt, 50/60 Hz source.
This device complies with Part 15 rules.
EN-3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ishd23hdgIshd23cdg

Table des Matières