External extraction
- During vertical surface works position the machine in such a
way the extractor tube is turned downwards.
- Assembly: insert an extractor tube on the coupling for the
extractor tube (4);
- Connect the extractor tube to an adequate vacuum system
(not supplied).
Maintenance
All maintenance operations are carried out with the
power supply disconnected. At the end of each work session,
or when required, remove any dust from the body of the tool
using a jet of compressed air, paying particular attention to
the motor ventilation slots.
No other maintenance operations must be undertaken by the
user. Maintenance and cleaning of the inner parts, like brus-
hes, ball bearings, gears etc. or others, must be carried out
only by an authorized customer-service workshop or on www.
storch.de. Use only the original STORCH parts or accessories.
Translation of the original instruction
77