3. PREPARE THE HOOD
F
V
D
O
OR
ERTICAL
ISCHARGE
The hood is set up at the factory for vertical discharge. Go to step 4 on page 7. Start on step 4.4.
F
H
D
OR
ORIZONTAL
ISCHARGE
3.4 From inside the hood, unfold the small retaining tab (A) (located on the edge of the blower opening) on the air
diffuser edge. See pictures below.
HD0109
Folded tab
3.5 Remove the metal shutoff plate from the back of the hood, by
removing the 3 screws. Set aside scews.
3.6 Press the metal shutoff plate on a flat surface to completely
flatten bent flange.
3.7 From the top of the hood, slide out the plastic air deviator
and discard.
3.8 Using the 3 screws removed from 3.5, install the metal shutoff
plate on top of the hood.
(CONT'D)
:
NLY
O
:
NLY
A
HD0108
Unfolded tab
HO0031
HD0119
HO0032
HO0036
- 6 -
A