Graf EPP Notice De Montage Et D'installation page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.2
Co
onnecting t
he air hoses
The ven
tilation hose
s and the th
of valves
s in the switc
ch cabinet.
For the l
lifters, hoses
s with 13 mm
needed
for the ven
tilation. Whe
connecto
ors.
To avoi
id leakage,
we recomm
connect
tion (red) wi
ith Teflon ta
In order
r to avoid c
confusion, th
connecto
ors on the sw
witch cabinet
Feed lifter
Stainless st
teel ventilation
Outflow lifte
er
Excess slud
dge lifter
Recomm
mended here
e is the GRA
PU foam
m can be use
d.
Onc
ce the hose
orde
er to preven
inte
erior of the c
Seal em
mpty
pipe
e
1.1
M
ounting the
e GRAF emp
.
Insert th
e hoses from
m the empty
in the em
mpty pipe sea
al.
Cut off th
he end of the
e hose to rem
4. A
Assemblin
ng the EPP
s
ree air lift pu
umps must b
m inner diame
eter are requ
en connectin
ng, make su
mend warm
ming the ho
ape.
he lifters in
the setting-
t are all colou
ur coded:
n
AF empty pip
pe seal mad
s have bee
n laid and a
nt gas excha
ange betwee
cabinet (moi
isture, odou
pty pipe seal
l made from
pipe into the
e holes
move this plu
ug.
14 / 32
P switch c
cabinet
be connected
d to the hose
uired, while a
a hose with
ure that the
hoses are
oses and ad
dditionally s
-up kit, the
ventilation
red
d
blu
ue
bla
ack
wh
ite
e from PE fo
oam (art. no
attached, th
he empty pi
en the wast
tewater treat
urs).
m PE foam
Pus
sh the hose
through the
ma
terial remain
ns stuck in th
Pus
sh the empty
y pipe seal in
sea
al this tightly.
e connectors
on the Strip
19 mm inne
r diameter is
attached to
o the correct
sealing the
e feed hose
downpipe a
and the four
o. 107887). A
Alternatively,
pe must be
e sealed in
tment syste
em and the
thin top laye
er. A plug of
he end of the
hose.
nto the empty
y pipe to
p
s
t
e
r
,

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

107773

Table des Matières