10. Ducting Version-horizontal discharge ONLY:
Connect ducting to transition for horizontal discharge,
seal with duct tape and fix transition to the wall with four
screws, use the included adhesive rubber tape to seal
with hood once mounted.
11. Determine position of the conduit and cut a 1-1/4" (3.2
cm) hole at this location. Position the conduit.
Run wires through hole according the National Electrical
Code or CSA Standards and local codes and
ordinances.
There must be enough power supply cable from the
fused disconnect (or circuit breaker) box to make the
connection in the hood's Junction box/es.
Use caulking to seal all openings. Further adjustment do
conduit passage may be required when performing
electrical connection.
Do Not turn on power until installation is completed.
12. Remark center line and hood bottom on same location
as before and tape template on wall as in step 4 above.
13. Mount 2 hooks with wood screws (supplied in mounting
hardware kit) on top locations marked on template, then
remove template.
14. If necessary, two plastic spacer can be fitted on rear
side of the hood on screws passages (lower fastener
locations - snap into place) and fit Rubber adhesive tape
as shown in figure below.
Note: before using, the Rubber adhesive tape supplied
must be cut in 3 equal lenght pieces.
15. Hang hood on hooks with the 2 brackets.
WARNING
Excessive Weight Hazard - Use two or more people to
move and install range hood. Failure to do so can result
in back or other injury.
16. Level the appliance, using a carpenters level across
bottom of hood with levelling screws in mounting
brackets.
Note1: Levelling screws are supplied in the hardware
packet and must be screwed on top of the bracket.
Note2: Further adjustments may be possible sliding the
brackets, loosen the screws the fix them to the body of
the hood and retighten when hood is in place as desired.
10