Pontec PondoSolar Island 250 Control Notice D'emploi page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
Downloaded from www.watergardeningdirect.com
Safe operation
 Do not carry or pull the unit by its electrical cable.
 Only use original spare parts and accessories for the unit.
 In the case of electrical units and installations with a rated voltage of U > 12 V AC or U >30 V DC located in the wa-
ter: Isolate the units and installations (switch off and disconnect from the power supply) before reaching into the wa-
ter.
 Only operate the pump together with the supplied solar module.
 Do not allow the pump to run dry.
 Protect the unit from knocks or vibration.
 Clean the unit at least twice a year.
Installation and connection
How to proceed:
 B, C
Pull the blind plug out of the connection.
– The blind plug protects the electronics from the ingress of water.
– Insert the blind plug as soon as the connection plug is removed.
Insert the connection cable into the socket.
– Push the plug into the socket as far as possible to ensure that the connection is watertight.
Fit the pump to the float unit.
Fit the nozzle unit to the float unit.
Place the float unit onto the surface of the water.
Commissioning/start-up
How to proceed:
The rechargeable battery of the unit is not charged. Expose the unit to sunlight for one day before using it for the first
time. Then use the remote control to operate the device.
Remote control
 E
The remote control has a range of max. 10 m.
Description
A
B
C
D
Determines the pump operating time (max. 4 h).
 To overwrite the current setting, switch off the pump with
key D and then set the new pump operating time with key
A. The pump will then start up automatically.
Switches the LEDs on and off (they are only lit when it is
dark)
For setting the flow rate of the pump (5 stages)
For switching the pump on and off
Function
Press the key slowly 1 . The LED flashes according to the
newly set pump operating time.
 Example: Desired pump operating time 3 h.
Press the key A 3  slowly. The LED flashes 3  several
times in a row.
Press the key briefly.
Press the key slowly 1  for each stage.
Press the key briefly.
- EN -
9

Publicité

Table des Matières
loading

Table des Matières