2.2 Framing
Shown in this section are rough opening dimensions and clearances
for the plenums, unit installation, and unit installation with a TV
recess construction.
Rough opening framing dimensions should allow for wall covering
thickness and facing materials.
CLW-50
BHM-44
Ceiling
Ceiling
½
½
½
3
"
1
"
3"
1
"
(89mm)
(38mm)
(76mm)
(38mm)
½
½
½
½
"
"
"
"
(12mm)
(12mm)
(12mm)
(12mm)
Figure 2.2, Minimum Clearances for Plenum Air Discharge to Ceiling
Komfort Zone Kit #KZK-1510A R.4
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
FRAMING AND CLEARANCES 9