Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
12. Put the hinge cover and the screw cover
back.
13. With the door closed, check that the door
is aligned horizontally and vertically and
that the seals are closed on all sides
before finally tightening the bottom
hinge. Re-adjust the levelling feet as
needed.

Space Requirements

xxxmm
30
xxxmm

Publicité

Table des Matières
loading

Table des Matières