Installation Overview - Napoleon Ascent 35 Manuel D'installation Et D'opération

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

general information
EN
1.2

installation overview

2
3
4
8
6
1
9
7
5
Recommended installation steps:
1. Determine venting requirements before deciding the final location of the appliance.
2. Install rough framing (see "rough framing" section).
3. Place the appliance in its final position.
4. Install appliance venting (see "venting installation" section).
5. Install all electrical wirings (see "electrical information" section).
6. Install gas lines (see "gas installation" section).
7. Test appliance.
8. Complete framing (see "finish framing" section).
9. Complete finishing (see "finishing" section).
6
W415-1399 / D / 10.15.18

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

B35ntB35nteB35ptB35pte

Table des Matières