5.
Inspect Screw Installation
A. Drywall
B. Wooden stud
C. Flat-head screw in
every slot at every stud
Make sure all screws are installed and flush with the channel.
■
7.
Channel Spacing
18" (46 cm)
NOTE: If channels are to be used to support accessory
hooks and/or small item bins, they may be spaced in
any way desired. If channels are being used to support
Gladiator
Wall GearBoxes, they must be installed
®
18" (46 cm) apart.
A
B
C
D
E
D. 1" (2.54 cm) min. to 1¼"
(3.17 cm) max. if near wiring
E. 1/4" (6.3 mm)
6.
Repeat for Additional Channels
Repeat this process for the next desired application area.
■
8.
Install Ends Caps (sold seperately)
From the front, snap the end cap onto each end of the
■
run of GearTrack
Channel.
®
BUBBLE LEVEL
5