1.3
installation overview
12
Non-combustible
board
Recommended installation steps:
1. Determine all optional accessories and requirements for installation (see Owner's Manual for accessories).
2. Determine venting requirements before deciding the final location of the appliance.
3. Determine finish floor thickness (see "finish floor consideration" section).
4. Install rough framing (refer to "rough framing" section).
5. Install nailing tabs and standoff assembly (refer to "nailing tab installation" and "standoff assembly" sections).
6. Place the appliance in its final position.
7. Install appliance venting (refer to "venting installation" section).
8. Install all electrical wirings (refer to "electrical information" section).
9. Install gas lines (refer to "gas installation" section).
10. Test appliance.
11. Complete framing (refer to "finish framing - typical" or "finish framing - recess" sections).
12. Finishing (refer to "finishing" section).
note:
For Universal Heat Management installation steps, refer to the leaflet provided with the UHM kit. Start UHM
installation before step 6 (place the appliance in its final position).
11
5
6
general information
2
3
4
9
8
W415-1935 / G / 05.10.22
EN
5
7