Kohler K-98741 Guide D'installation Et D'entretien page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6-3/4" (172 mm)
Soldering Template
Clamp each tee
to the template
during soldering.
3. Install the Supply Piping – Multiple Supplies
Route the water supply lines.
Use the provided soldering template to construct the pressure
balancing loops.
Position tees in the loops over each of the four raised locations on
the template.
Solder the assembly while it is attached to the template.
IMPORTANT! To ensure proper alignment of the tees with the
product, the two pressure balancing loops must be rigidly connected
to each other while on the soldering template.
While still on the soldering template, rigidly connect the two
pressure balancing loops to each other.
Remove the pressure balancing loop assembly from the template.
Connect the pressure balancing loops to the water supplies.
Do not strap the pipes.
Temporarily install a nipple to each tee. Do not use any sealant.
Kohler Co.
Ø 9-5/8"
(244 mm)
6-3/4"
(172 mm)
1/2" NPT Nipple
Rigidly connect
to each other.
9
Pressure
Balancing
Loops
Soldering
Template
1207716-2-C

Publicité

Table des Matières
loading

Table des Matières